Installation of 90m long Railway Bridge Enabling Girder

Installation of 90m long Railway Bridge Enabling Girder
  • Project location – Between Naihati and Bandel on river Ganga
  • Client – Tantia Construction
  • Project description – Installation of 1100 tonnes enabling girder (90m long) between two piers of the new railway bridge between Naihati and Bandel on river Ganga
  • Technical details and constraints
    • Girder – Weight : 1100 tonnes, Length : 90m
    • Barge – M.V. Marine XXIV (77mX20m)
    • Equipment – Full anchoring arrangement, with laying of 10 buoys for precise movement and positioning of barge

Leave a Comment

Your email address will not be published. Required fields are marked *

Phone: +91-33-243-5382/5384
Fax: +91-33-248 8182
9/12, Lal Bazar Street, Kolkata - 700001, India
Mercantile Buildings, 2nd Floor

Powered by themekiller.com anime4online.com animextoon.com